Sustainable design isn’t just a trend—it’s fast becoming a contractual requirement for public and private development projects worldwide. The LEED AP Building Design + Construction (BD+C) credential proves you can drive projects through every phase of LEED certification, from schematic visioning to final commissioning. Below you’ll find a mini practice test (10 fresh, 2025-aligned questions) plus a roadmap for turning those practice points into a guaranteed first-attempt pass.
10 Quick-Fire Questions (BD+C 2025 Blueprint)
-
Integrative Process Credit
During discovery, the project team models site energy savings of 18 %. To meet the IP credit’s energy requirement, they must:
A) Perform a water balance study only B) Document ≥ 5 % energy savings at design completion
C) Model two HVAC systems for ≥ 10 % savings D) Implement a solar array achieving 1 % site energy offset -
LT Credit—Surrounding Density & Diverse Uses
For the “Diverse Uses” option, how many qualifying uses within ½ mi (800 m) are required?
A) 5 B) 7 C) 10 D) 12 -
SS Prerequisite—Construction Activity Pollution Prevention
The SWPPP must conform to which U.S. standard (or local equivalent)?
A) EPA ENERGY STAR B) EPA Construction General Permit C) SITES v2 D) ASHRAE 90.1-2022 -
WE Credit—Outdoor Water Use Reduction
A baseline case shows 200,000 gal/yr irrigation. The design achieves 80 % reduction. How many points can the project earn?
A) 1 B) 2 C) 3 D) 4 -
EA Credit—Optimize Energy Performance
To claim Option 1: Whole-Building Energy Modeling, the project must show a minimum cost savings of:
A) 3 % B) 5 % C) 6 % D) 10 % -
MR Credit—Building Product Disclosure & Optimization, Sourcing of Raw Materials
How many permanently installed products (from ≥ 3 manufacturers) must have EPD-Type III certificates to earn 1 point under Option 1?
A) 10 B) 20 C) 15 D) 25 -
IEQ Prerequisite—Construction IAQ Management
Which filtration rating is required for return air during construction in occupied spaces?
A) MERV 8 B) MERV 11 C) MERV 13 D) MERV 15 -
IEQ Credit—Daylight
Under the sDA 300/50 % option, what minimum percentage of regularly occupied floor area must achieve the target?
A) 50 % B) 55 % C) 60 % D) 75 % -
Regional Priority Credits
How many Regional Priority points can any BD+C project earn at most?
A) 2 B) 3 C) 4 D) 6 -
Certification Thresholds
To achieve LEED Gold, a BD+C project must earn at least:
A) 50 pts B) 60 pts C) 70 pts D) 80 pts
Answer Key
1-B | 2-C | 3-B | 4-C (≥ 80 % = 3 pts) | 5-B (≥ 5 % savings) | 6-B |
7-C (MERV 13) | 8-A (50 %) | 9-C (max = 4) | 10-B (60 pts)
Scoring:
-
8-10 correct: Book your exam date—focus on timing drills.
-
5-7 correct: Review integrative process and MR disclosure nuances.
-
<5: Start with credit category flashcards and low-stakes quizzes.
How to Turn Quiz Points into a First-Attempt Pass
-
Timed Mock Exams (4×50 Qs) – Replicate the 2-hour, 100-question format.
-
Interactive Credit Mapping Labs – Practice scorecard strategies for Silver, Gold, and Platinum targets.
-
One-to-One Mentor Calls – Walk through tricky daylight calculations and EPD sourcing hurdles with LEED Faculty–certified trainers.
-
24 × 7 WhatsApp War-Room – Stuck on LT Diverse Uses at 1 a.m.? Ping us.
-
Pay-Only-After-You-Pass Guarantee – Tuition due only after USGBC posts “PASS” to your LEED Online account.
Need prep for the O+M specialty instead? Check our guide How to Prepare for the LEED AP O+M Exam for a parallel roadmap.
Ready to Secure Your LEED AP BD+C Badge?
📲 Grab a free 30-question BD+C PDF or schedule a 15-minute roadmap call: https://certfastpass.net/contact/
Try smarter. Pass faster. Build greener—with Cert Fast Pass.
Leave a Reply